| |
|
| |
|
|
| |
|
|
| |
|
|
| |

|
|
| |
|
|
| |
| |
• Hewlett
Packard Austin Data Center – Austin, TX |
|
| |

|
| This project consists of converting
an existing building in southeast Austin into a new
200,000 square feet Hewlett-Packard data center. The
scope of work includes performing analysis on the existing
structure and designing several peripheral structures,
including a generator yard and transformer yard. |
|
|
| |
|
|
| |
|
|
| |
• Front
Bank Data Center – San Antonio, TX |
|
| |
|
| This project consists of a single-story
data center/office building and a single-story transformer
building. This building is approximately 40,000 S.F.
This project also includes a mechanical yard, an electrical
yard, a utility yard and a generator pad. The data center
portion of the building is hardened to resist a class
F3 tornado. |
|
|
| |
|
|
| |
|
|
| |
• ERCOT
Taylor Campus TCC3 – Taylor, TX |
|
| |
|
This project consists of a single-story, 22,000-square-foot
data center/office building. This project also includes
a mechanical yard, and an electrical yard. The data
center portion of the building is hardened to resist
a class EF3 tornado. |
|
|
| |
|
|
| |
|
|
| |
• ERCOT
Bastrop Control Center BCC1 – Bastrop, TX |
|
| |
 |
This project consists of a single-story, 36,000-square-foot
data center/office building. This project also includes
a mechanical/electrical yard. The data center portion
of the building is hardened to resist a class EF3 tornado.
|
|
|
| |
|
|
| |
|
|
| |
• AMD
Corporate Headquarters Data Center – Austin, Texas
• Charles Schwab/Research Park 3 Data Center –Austin,
Texas
• Chase Operations/Data Center Bridges – Tempe,
Arizona
• Cole Carrier Switching Station – Phoenix, Arizona
• Dell PS5 Data Center – Round Rock, Texas
• Ercot Data Center – Bastrop, Texas
• Ercot Data Center – Taylor, Texas
• First Data, Data Center Facility – Chandler,
Arizona
• Frost Bank Data Center – San Antonio, Texas
• HP Austin Data Center – Austin, Texas
• New England Business (NEBS) Office and Call Center
– Flagstaff, Arizona
• Swift Transportation Corporate Headquarters/ Data
Center – Phoenix, Arizona
• USAA Regional Service Center – Phoenix, Arizona
• Washington Street Partners Data Center – Gresham,
Oregon
|
|
| |
|
|
| |
|
|
|
|
| |
|
|
|